Case study · Energy · Land and sea

86-tonne transformer delivered 2 days before ROS with zero incidents

Client
LOGO PT Contoh Energi Konstruksi
Service
Project cargo, land and sea
Cargo
60 MVA transformer, 7.8 × 3.4 × 4.1 m
Route
Cilegon → East Kutai substation
Duration
23 days · January 2026

Sample case study · data not final

01

Challenge

A 60 MVA transformer weighing 86 tonnes had to reach the East Kutai substation before commissioning. Any delay would push back the whole energisation schedule.

The road from the jetty to the site crossed several bridges with load limits far below the cargo weight.

  • 86 tonnes grossNeeded a 12-axle trailer and a barge.
  • Load-limited bridgesTwo bridges were missing from the project map.
  • Road permitsDispensation permits and escorts were needed from several agencies.

02

Solution

  1. 1
    Route survey

    The team drove the route from jetty to site, measuring bridges, bends and overhead cables.

  2. 2
    Temporary bridge reinforcement

    Two bridges were reinforced with steel beams to an engineer's calculation.

  3. 3
    Barge and multi-axle trailer

    The transformer was loaded onto a barge in Cilegon, then transferred to a 12-axle trailer at the jetty.

  4. 4
    Escort and placement

    The convoy was escorted to site and the transformer jacked onto its foundation.

03

Results

days ahead of ROS
2
incidents in transit
0
tonnes gross moved in a single lift
86

The route survey report, bridge reinforcement calculations and signed handover report are available for review.

Project photos

  • Large transformer moved on an escorted multi-axle trailer along a road
    Crossing a reinforced bridge.
  • Route survey before delivery.
  • Loading onto the barge in Cilegon.
  • Placement at the substation.
PHOTO
“The survey team found two bridges that were not on our project map. Without that, our transformer would have been stuck halfway.”
Hendra Wijaya Project Manager, PT Contoh Energi Konstruksi Sample testimonial

Heavy or oversized cargo with an ROS deadline? Start with a route survey.

Our engineer contacts you within 1 working day to discuss dimensions, weight and timeline.

  • All-risk policy per project · Sample
  • Client references available on request
  1. 1 Send your machine listApproximate dimensions and weights are enough.
  2. 2 Talk to an engineerWithin 1 working day, including a survey date.
  3. 3 Receive a technical proposalCost, schedule and method statement.
Request a quote WhatsApp