Projects we have delivered
Filter by service and industry to find cases similar to yours.
10 case studies Clear filters Sample data
-
FMCG Trucking
98% of units arrived on their loading slot for 6 months
- Cargo
- Packaged food, 40 CDD trucks per week
- Route
- Cikarang → 14 cities in Central Java
- Result
- 98% on slot
-
Manufacturing Trucking
38 factory machines relocated in 6 days
- Cargo
- 38 production machines, 210 tonnes in total
- Route
- Tangerang → Karawang
- Result
- 2 days ahead of plan
-
Manufacturing Sea
Late deliveries to Sulawesi cut from 31% to 4%
- Cargo
- Plastic products, weekly LCL
- Route
- Surabaya → 12 distributors in Sulawesi
- Result
- Late deliveries down from 31% to 4% in 3 months
-
Construction Sea
Building material stock in Sorong never ran out for 9 months
- Cargo
- Cement and steel, 6 FCL a month
- Route
- Surabaya → Sorong
- Result
- 0 days out of stock
-
Energy Project cargo
86-tonne transformer delivered 2 days before ROS with zero incidents
- Cargo
- 60 MVA transformer, 7.8 × 3.4 × 4.1 m
- Route
- Cilegon → East Kutai substation
- Result
- 2 days early, 0 incidents
-
Mining Project cargo
12 mining dump trucks mobilised in 3 weeks
- Cargo
- 12 × 100-tonne dump trucks, partly dismantled
- Route
- Tanjung Priok → South Kalimantan mine site
- Result
- On mobilisation schedule
-
Construction Project cargo
42 m bridge girders installed within one night permit window each
- Cargo
- 8 steel girders, 42 m, 38 tonnes each
- Route
- Gresik → East Java toll road project
- Result
- 1 night per girder
-
Manufacturing International
Imported machine cleared customs in 2 working days
- Cargo
- Injection moulding machine, LCL from Shanghai
- Route
- Shanghai → Tanjung Priok → Bekasi
- Result
- 2-day clearance
-
FMCG International
Zero demurrage across 8 consecutive export shipments
- Cargo
- Snack foods, FCL 40 ft
- Route
- Semarang → Rotterdam
- Result
- IDR 0 demurrage over 8 consecutive shipments
-
Manufacturing Project cargo
24 factory machines moved from Bekasi to Makassar in 11 days, with zero damage
- Cargo
- 24 production machines, 186 tonnes in total
- Route
- Cikarang, Bekasi → Tanjung Priok → Makassar → KIMA
- Result
- Production restarted on day 11
No case studies yet for
We cannot publish every project. Our coordinator can tell you about similar work directly.
Need something similar to one of these cases? Tell us the details.
A written quote within 30 minutes during working hours, Monday to Saturday 08:00–18:00 WIB.
- Cargo insurance up to IDR 5 billion · Sample
- NIB 0000000000000 · Sample
- 1 Fill in a 3-step formAbout 2 minutes. No account needed.
- 2 A coordinator contacts youWithin 30 minutes during business hours, by WhatsApp or phone.
- 3 Receive a written quoteFleet, schedule and cost breakdown. No obligation.